The whole thing is tied to allowing a municipality to impose tolls on federally funded roads.
I assume the problem is that they can’t put the toll cameras on every exit so they do it at the bridges (which are federally funded?). I guess if I was NYC I’d just figure out a way to put the cameras on my own goddamn streets and then I don’t need the Fed’s permission.
I hate to see the users harmed but it makes me giggle that apple has backed themselves into a corner like this while all us Android Poors are busy ditching everything that’s not USB-C as fast as we can
Oh man, it sure did. A very relieved couple and I was the hero for the weekend
I fished a wedding ring out of a basement shower drain with one of those flexible grabbers. Drain is made of iron pipe and embedded in concrete, so even demolition may have lost or destroyed the ring. It was past the trap and could be seen with a small snake camera. I had a flexible grabber that was spring all the way to the end, we stuck the camera in, and I got the ring after about 5 minutes of careful manuvering.
Yeah, as far as popes go he was pretty chill
lol, did he really call his SC appointees “radical Marxists”? I just can’t keep up anymore
Oh, I meant people he installed but yeah, he’s been running rampant through “Biden’s people”
Oh that’s right, just this week, right? 72 hours?
Trump really hasn’t fired anyone yet, has he? Strap in, Pete. It’s gonna be a rough week at the office.
In a rich man’s car there is nowhere to spit but his floormat
Bob had it tattooed, didn’t he?
Bortender: what’ll you have?
Well fuck him then.
Something tells me he wouldn’t stand behind my Dem rep too much, she doesn’t really vote for the oligarchy.
google strips capitalization from searches
I think Gemini is “in heat”
just run Sid
Texas flag banned in my house over exposed dicks.
122 days must be the time to construct the actual machine and not the building plus the machine, right? Shit, just the dirt work is about 3 months on the colos I’ve been working on in Wyoming. The electricians take about 6 months to work their way down the whole building of 5 colos, so a month for something the size of what’s in those pictures.
Cutting corners on power of that scale or the foundation holding up all that arc flash hazard is asking for trouble, IMO. And in WY they are using huge evaporative coolers but in TN they must need to use either liquid cooling or regular refrigerant AC systems because it’s so much more humid.